Announcement information

Correction notice of technical service for supervision of related projects of protection and utilization project of ancient post road in Zhenjiang District (phase I) (the first time)

2021-12-24 17:26:57
Share with:

1、 Basic information of the project

Purchase plan no. of the original announcement: 440204-2021-01189

Purchase item no. of the original announcement: 2021-495-SGHZ-GZZ

The name of the original announcement procurement project: Zhenjiang District ancient post road protection and utilization project (phase I) related engineering supervision technical services

Date of first announcement: December 20, 2021

2、 Correction information:

Correction: procurement documents

Correction reason: scoring rules

Correction:

(1) Original public bidding documents 34 pages

Business section( 60 points

Project director

1. Those who have obtained the certificate of registered supervision engineer and have been registered for more than 11 years (including 11 years) and have the title of senior engineer will be given 7 points;

2. Those who have obtained the certificate of registered supervision engineer and the registration period is less than 11 years and more than 5 years (excluding 11 years) and have the title of senior engineer, 3 points will be obtained;

3. Those who have obtained the certificate of registered supervision engineer and have the title of senior engineer will get 1 point;

Note: this item is the highest 7 points, and the term is subject to the registration time in the registration certificate. Provide personnel title certificate, registered supervision engineer qualification certificate, copy of registered supervision engineer registration certificate and other relevant supporting documents, as well as copies of social security certification materials of the bidder's own unit in recent half a year, with official seal, if not provided, no score will be given.

7 points

Other supervisors Staffing (except project director)

1. If the number and specialty of the personnel to be dispatched fully meet the requirements of Table 2 "demand table for other personnel of project supervision organization" (hereinafter referred to as "demand table"), 2 points will be obtained; if it does not meet the requirements of other personnel demand table of project supervision organization, no score will be given.

2. Each person with professional supervision engineer will get 1 point, and the maximum score will be 3 points.

3. At least one of the supervisors has the title of senior engineer and registered supervision engineer's registration certificate; 3 points.

4. If at least one of the registered cost engineers is equipped with the certificate of registered cost engineer, the certificate of registered supervision engineer, the certificate of first class registered constructor and the title of senior engineer, and the registered unit is the bidder, 7 points will be obtained.

Note: the above staffing table is referred to 2 "other personnel demand table of project supervision organization", no cumulative score; Copies of relevant certificates and social security certificate materials of the bidder's unit in recent half a year shall be provided with official seal. No score will be given if the copies are not provided.

15 points

 

It is now corrected as follows:

Business section( 60 points

Project director

1. Those who have obtained the certificate of registered supervision engineer and have been registered for more than 11 years (including 11 years) and have the title of senior engineer will be given 7 points;

2. Those who have obtained the certificate of registered supervision engineer and the registration period is less than 11 years and more than 5 years (excluding 11 years) and have the title of senior engineer, 3 points will be obtained;

3. Those who have obtained the certificate of registered supervision engineer and have the title of senior engineer will get 1 point;

Note: this item is the highest 7 points, and the term is subject to the registration time in the registration certificate. Provide personnel title certificate, registered supervision engineer qualification certificate, copy of registered supervision engineer registration certificate and other relevant supporting documents, as well as social security certificate of the bidder's unit in recent six months Or retirement certificate If the copy of the materials is stamped with official seal, no score will be given.

7 points

Other supervisors Except project director

1. If the number and specialty of the personnel to be dispatched fully meet the requirements of Table 2 "demand table for other personnel of project supervision organization" (hereinafter referred to as "demand table"), 2 points will be obtained; if it does not meet the requirements of other personnel demand table of project supervision organization, no score will be given.

2. Each person with professional supervision engineer will get 1 point, and the maximum score will be 3 points.

3. At least one of the supervisors has the title of senior engineer and registered supervision engineer's registration certificate; 3 points.

4. If at least one of the registered cost engineers is equipped with the certificate of registered cost engineer, the certificate of registered supervision engineer, the certificate of first class registered constructor and the title of senior engineer, and the registered unit is the bidder, 7 points will be obtained.

Note: the above staffing table is referred to 2 "other personnel demand table of project supervision organization", no cumulative score; Copies of relevant certificates and social security certificates of the bidder's unit in recent six months shall be provided Or retirement certificate If the copy of the materials is stamped with official seal, no score will be given.

15 points

 

two )Original Public bidding file thirty-five page


System certification

1. If the bidder has five certificates, including quality management system certification, occupational health and safety management system certification, environmental management system certification, service quality evaluation system certification, and anti bribery system certification and certificate, which are within the validity period, 15 points will be obtained;

2. Those who have 4 certificates mentioned above and are within the validity period will get 8 points;

3. Those who have the above three certificates and are within the validity period will get 3 points;

4. Those who have two certificates mentioned above and are within the validity period will get 1 point.

notes : this item is the highest one two Points. The validity of the certificate is on the official website of CNCA( http://www.cnca.gov.cn/ )Can check, and provide a screenshot, provide a copy of valid certification certificate with official seal, otherwise no score.

15 points

 

It is now corrected as follows:


enterprise management system

The bidder also has effective Quality management system certification, occupational health and safety management system certification, environmental management system certification have to 5 points, 3 points will be deducted for each lack of certification until all points are deducted;

notes The validity of the certificate is on the official website of the national certification and Accreditation Administration( http://www.cnca.gov.cn/ )Can check, and provide a screenshot, provide a copy of valid certification certificate with official seal, otherwise no score.

5 points

enterprise Service system

The bidder's service quality and customer satisfaction are high, reaching According to the requirements of GB / t36733-2018, GB / t19039-2009 and ctsses1001-2019, and obtain the corresponding "service quality evaluation system certification", 5 points will be obtained; No, no score.

Note: copies of relevant valid certificates and network inquiry shall be provided (national certification and Accreditation Administration Commission) http://www.cnca.gov.cn/ )If the screenshot is not in conformity with or complete with the official seal, or the issuing date of the certification certificate is not before the release time of the bidding announcement, no score will be given.

5 points

The system of honest and clean government construction of the bidder is perfect, and its anti bribery ability reaches 5 points will be given if the requirements of iso37001-2016, szdb / z245-2017 and ctsses1001-2019 are obtained and the corresponding "anti bribery system certification certificate" is obtained; No, no score.

Note: copies of relevant valid certificates and network inquiry shall be provided (national certification and Accreditation Administration Commission) http://www.cnca.gov.cn/ )If the screenshot is not in conformity with or complete with the official seal, or the issuing date of the certification certificate is not before the release time of the bidding announcement, no score will be given.

5 points

Other contents remain unchanged

Correction date: December 24, 2021

3、 Other supplementary matters

nothing

4、 If you have any questions about the contents of this announcement, please contact us by the following ways.

Buyer information

name Name: land development and consolidation center of Zhenjiang District, Shaoguan City

Address: Daxue Road, Zhenjiang District, Shaoguan City No. 5

contact information: 0751-8313603

2. Purchasing agency information

name Name: Guangdong Hezheng procurement tendering Co., Ltd

Address: Baiwang Avenue, Wujiang District, Shaoguan City, Guangdong Province 5 / F, R & D office building, guanshao innovation and entrepreneurship center, No. 42

contact information: 0751-8219991

3. Project contact information

Project contact person: Yang Gong

Telephone: 0751-8219991


Issued by: Guangdong Hezheng procurement tendering Co., Ltd

                     Release time: 2021 twelve month twenty-four day



Back to list
Application Form Download
Online registration entry

Your browser version is too low, in order to facilitate the normal browsing of the web page

Please upgrade your browser: Or the following browser: / /